Critical Path
1.2
Peter Tsang
3.50
2 reviews
$1.99
About Critical Path
Developed by Peter Tsang, Critical Path is an Android app falling under the category of Overall. Since August 2018, you can download the app.
It's currently not in the top ranks.
Receiving feedback from 2 ratings, it has achieved 3.50 out of 5 stars. The last update of the app was on June 25, 2023. Critical Path has a content rating "Everyone".
Critical Path has an download size of 9.08 MB and the latest version available is 1.2. Critical Path costs $1.99 to download.
It's currently not in the top ranks.
Receiving feedback from 2 ratings, it has achieved 3.50 out of 5 stars. The last update of the app was on June 25, 2023. Critical Path has a content rating "Everyone".
Critical Path has an download size of 9.08 MB and the latest version available is 1.2. Critical Path costs $1.99 to download.
Description
More data about Critical Path
Price | $1.99 |
Rating | 3.50 based on 2 ratings |
Ranking | Not ranked |
Version | 1.2 |
App download size | 9.08 MB |
Suitable for | Everyone |
Related apps
More from Peter Tsang
Changelog
No changelog data
Developer information for Peter Tsang
Peter Tsang
N/A
Share
Comments for iOS
We don't have enough comments to show example comments. Please check back later.
App Store Rankings
This app is not ranked
Technologies
Back to top