WBS - Project Work Breakdown
6.5
皓 李
4.72
139 reviews
$8.99
About WBS - Project Work Breakdown
WBS - Project Work Breakdown is an app developed
by 皓 李.
The app has been available since May 2014.
It's currently not in the top ranks.
It's rated 4.72 out of 5 stars, based on 140 ratings. The last update of the app was on April 23, 2023. WBS - Project Work Breakdown has a content rating "Everyone".
WBS - Project Work Breakdown has an download size of 57.65 MB and the latest version available is 6.5. WBS - Project Work Breakdown costs $8.99 to download.
It's currently not in the top ranks.
It's rated 4.72 out of 5 stars, based on 140 ratings. The last update of the app was on April 23, 2023. WBS - Project Work Breakdown has a content rating "Everyone".
WBS - Project Work Breakdown has an download size of 57.65 MB and the latest version available is 6.5. WBS - Project Work Breakdown costs $8.99 to download.
Description
More data about WBS - Project Work Breakdown
Price | $8.99 |
Rating | 4.72 based on 140 ratings |
Ranking | Not ranked |
Version | 6.5 |
App download size | 57.6 MB |
Suitable for | Everyone |
Alternatives for the WBS - Project Work Breakdown app
More from 皓 李
Changelog of WBS - Project Work Breakdown
No changelog data
Developer information for 皓 李
皓 李
N/A
Share WBS - Project Work Breakdown
Comments on WBS - Project Work Breakdown for iOS
We don't have enough comments to show example comments. Please check back later.
App Store Rankings for WBS - Project Work Breakdown
This app is not ranked
Technologies used by WBS - Project Work Breakdown
Back to top